Analytics, Construction, Good for Business, Lithuania, Real Estate

International Internet Magazine. Baltic States news & analytics Friday, 26.04.2024, 12:41

In Q2, the volume of construction works in Lithuania grew to EUR 628.5 mln

BC, Vilnius, 14.08.2017.Print version
Statistics Lithuania informs that in II quarter 2017, the volume of construction works carried out in the country amounted to EUR 628.5 million at current prices and, against the previous period, seasonally and calendar adjusted, grew by 0.5% at constant prices (unadjusted – by 72.6%).

Over the quarter, the volume of building construction decreased by 2.6%, that of construction of civil engineering structures – increased by 5.4% (unadjusted – increased by 30.5% and 2.8 times respectively).


In II quarter 2017, against the respective period of the previous year, the volume of construction works carried out, calendar adjusted, increased by 6.5% (unadjusted – by 5.8%). Against the same period of the last year, the volume of building construction increased by 5.7, of civil engineering structures – by 7.4% (unadjusted – by 5.9 and 5.7% respectively).


The share of construction of civil engineering structures accounted for 45% of all construction works carried out within the country (EUR 282.3 million), non-residential building construction – 36% (EUR 227.5 million), residential building construction – 19% (EUR 118.7 million).


In I half-year 2017, construction work carried out within the country amounted to EUR 989.2 million and, against I half-year 2016, both calendar adjusted and unadjusted, increased by 6.7%.


Changes in the volume of construction work carried out, at constant prices of 2010, growth, drop (–),% / times

 

II quarter 2017, against

I quarter 2017, seasonally and calendar adjusted

I quarter 2017

II quarter 2016, calendar adjusted

II quarter 2016

Within the country

0.5

72.6

6.5

5.8

Buildings

–2.6

30.5

5.7

5.9

 residential

–5.2

38.8

0.2

1.7

 non-residential

–1.3

26.5

8.9

8.1

Civil engineering structures

5.4

2.8 t.

7.4

5.7



In II quarter 2017, the volume of construction works carried out abroad amounted to EUR 68.3 million. Against the previous period, seasonally and calendar adjusted, it increased by 15.1% (unadjusted – by 37.4%), against the respective period of the previous year, calendar adjusted, – by 5.7% (unadjusted – 5.2%).

In I half-year 2017, the volume of construction works carried out abroad amounted to EUR 117.4 million and, against I half-year 2016, calendar adjusted, increased by 0.1% (unadjusted – by 0.3%).

All comparative indicators are calculated at constant prices of 2010 using a construction input price index.


Concepts

Construction work carried out refers to the value (VAT excluded) of all kinds of work carried out when building a new structure, reconstructing, repairing (restoring) or demolishing a structure for a customer (sale) or for own needs. It excludes the value of land and design work.

 

For more information, see the Database of Indicators.






Search site